Switching On And Testing C6 Smart; Figure 16: Power Supply Connection Details; Figure 17: Initialisation Of The C6 Smart - KEB COMBICONTROL C6 SMART Instructions For Use Manual

Hide thumbs Also See for COMBICONTROL C6 SMART:
Table of Contents

Advertisement

INSTALLATION AND CONNeCTION
1
2
3
Figure 16:

3.7.4 Switching on and testing C6 SMART

Figure 17:
If any cable is connected to the DVI port, the display will switch on accordingly, and after
few seconds the operating system desktop will appear.
EMC ground (0V)
- (0V)
+ (24V)
Power supply connection details
Connect the power supply cable to C6 SMART.
Switch on the power supply.
The "Power" LED will light.
Initialisation of the C6 SMART
1
2
3
33

Advertisement

Table of Contents
loading

Table of Contents