4.7. UPS System Installation (1200 kW)

4.7.1.

Mechanically joining the Cabinet Sections

4.2.1.1.
For the following steps, verify that the forklift or pallet jack is rated to handle the
weight of the cabinet (see
Do not tilt the UPS cabinets more than 10° from vertical or the cabinets may tip over.
Use care during installation to protect from damage the components mounted on the right
side of section and the intercabinet wiring harnesses attached to the left side section.
1. Remove the front and rear baffle Plates of the UPS cabinets. Please keep the baffle Plates
and screws for later use;
See
Figure 2-4
2. Use the holes on the feet, place the UPS cabinets on the ground or channel steel;
See
Figure 3-6
contact customer service to provide;
3. Remove the M6*16 screws (32pc) of the rear doors of the primary cabinets and the
secondary cabinets, and remove the rear doors, please keep the rear doors and screws for
later use, and reinstall the back door after all installations are completed;
4. Place the two cabinets side by side, use M6*16 screws (20pc) to connect and the primary
cabinets and the secondary cabinets, torque: 9Nm;
See
Figure 4-13
5. Install the front and rear top hardware kits (2pc) of the cabinets, remove the M12 screws
(4pc) on the top of the cabinets, and then install, torque: 28Nm;
See
Figure 4-13
6. Install the bottom hardware kit (1pc) of the cabinets, use M10*30 bolts (4pc)/M10 spring
washers (4pc)/M10 large flat washers (4pc) to fix, torque: 28 Nm; after installation, use a
torque wrench to tighten the bolts , Torque: 28 Nm;
See
Figure 4-13
7. Fix the cabinet foot to the floor or channel steel, reinstall the baffle Plates, and use the
M10*25 bolt (32pc)/M10 spring washer (32pc)/M10 large flat washer (32pc) removed in step
1 to fix it. Torque: 28 Nm;
8. Install the MC cables on the busbars, pass the MC cables (3pc MC L1/ 3pc MC L2/ 3pc MC
L3) of the primary cabinet through the large square hole at the rear bottom of the cabinets,
and fix it to the busbars; use M10*30 bolts ( 9pc)/M10 spring washer (9pc)/M10 large flat
Copyright © 2021 Eaton Corporation plc. All rights reserved.

Mechanical Connection Between Primary Cabinet and Secondary Cabinet

NOTE
Table 3-1
NOTE
for the location of the baffle Plates;
and
Figure 3-7
bottom view for hole dimensions. For more detailed installation drawings, please
for the screw location;
1
for the location of the top hardware kits;
2 3
for the location of the bottom hardware kit;
4
Installation and Operation Manual
Dimensions and Weights ).
Eaton 93PR 60-1200 kW UPS