Page 3
5.10 Third Party Intellectual Property Rights. The Firmware may contain components transfer the Firmware directly to a third party only in connection with the sale of the Eaton (including open source software components) that are owned by third parties (“Third Party product in which it is installed.
3.2.3 External Parallel UPS System Power Wiring Preparation................25 3.2.4 UPS System Interface Wiring Preparation ....................35 3.3 Inspecting and Unpacking the UPS Cabinets ....................37 Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 6
7.2.2 System Events........................... 87 7.2.3 Using the LCD Touch Screen......................... 87 7.2.4 Using the Menu..........................88 7.2.5 Mimic Screen ............................ 89 7.2.6 Display Menu Operation........................89 Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 7
8 8 U U P P S S M M a a i i n n t t e e n n a a n n c c e e ......................................................1 1 1 1 5 5 8.1 Important Safety Instructions ........................115 8.2 Performing Preventive Maintenance ......................115 Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 8
1 1 1 1 W W a a r r r r a a n n t t y y ........................................................... . 1 1 2 2 5 5 viii Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 9
Normally-Closed REPO Switch Wiring ....................70 Figure 38. Main Elements of the UPS System ....................73 Figure 39. Path of Current Through the UPS in Energy Saver System Mode............75 Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 10
Typical EAA Control Screen ......................100 Figure 67. REPO Operation ........................106 Figure 68. Air Filter Location ........................117 Figure 69. Optional Minislot Cards ....................... 119 Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 11
Display Menu Operation ......................... 90 Table 23. Controls Menu Operation ........................ 97 Table 24. Typical System Status Messages...................... 97 Table 25. IRC-MS Default Triggers ....................... 119 Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 12
List of Tables Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
The Eaton 93PM – 100 kW Frame UPS is available with one, two, or three Uninterruptible Power Modules (UPMs) integrated in one cabinet. Each UPM is rated for a maximum of 50 kW. The system maximum rating is 100 kW.
Page 14
Figure 1. Eaton 93PM UPS – 100 kW Frame Figure 2. Eaton 93PM UPS –100 kW Frame with Left or Right-Mounted Sidecar UPS with Left-Mounted Sidecar UPS with Right-Mounted Sidecar Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
1 1 . . 1 1 . . 4 4 E E n n e e r r g g y y S S a a v v e e r r S S y y s s t t e e m m M M o o d d e e The 93PM Series UPS offers an Energy Saver System (ESS) mode that maximizes efficiency by eliminating unnecessary power conversion when the commercial power source is within acceptable voltage and frequency limits.
Page 16
UPS can then be safely serviced or replaced without interrupting power to critical systems. The four breaker configuration provides a convenient method for removing power from the UPS when using the maintenance Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 17
UPS from virtually any location within the facility, up to 300 feet from the UPS. Refer to the Eaton Remote Monitoring Device (RMD) Installation and Operation Manual, listed in paragraph 1.8 For More...
Type 2 installed on the load side is recommended. The SPD must meet the Maximum Continuous Operating Voltage (MCOV) for a 480V Delta Style SPD. Eaton offers a variety of SPD solutions including the Eaton SPD Series with various kA ratings options.
Page 19
Phillips and Pozidriv are registered trademarks of Phillips Screw Company. ECopyright 2008–2010 Eaton Corporation, Raleigh, NC, USA. All rights reserved. No part of this document may be Eaton, Powerware, and BladeUPS are registered trademarks of Eaton Corporation or its subsidiaries and affiliates.
Page 20
Operation, including breakers, standard features and optional accessories, procedures for using the bypass functions, and information about maintenance Refer to the Eaton 93PM Sidecar Integrated Accessory Cabinet-Tie and Tie Bypass (50 kW and 100 kW SIAC-T, and 50 kW and 100 kW SIAC-TB) Installation and Operation Manual for the following additional information: •...
Page 21
1 1 . . 1 1 0 0 E E q q u u i i p p m m e e n n t t R R e e g g i i s s t t r r a a t t i i o o n n Please visit www.eaton.com/pq/register to register your new Eaton UPS / Eaton UPS Accessory. Model Number: Serial Number: Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 23
• Do not open or mutilate batteries. Released electrolyte is harmful to the skin and eyes. It may be toxic. Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 24
Ne pas fumer près des accumulateurs. Ne pas produire de flamme ou d’étincelle dans la zone de l’accumulateur. Dissiper l'électricité statique de votre corps en touchant une surface reliée à la terre avant de toucher les accumulateurs. Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 25
The environmental requirements specified below are for the air at the intake ports of the 93PM UPS, and are the maximum, not to exceed, ratings. Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 26
The UPS ventilation requirements are shown in Table To allow for future power upgrades, Eaton recommends using air conditioning or ventilation sized for the fully rated UPS kW frame size installed instead of the derated kW ordered. Sizing the site cooling infrastructure to be capable of cooling the maximum kW frame size will allow a full power rating upgrade without having to modify the infrastructure.
Page 27
Manual, listed in paragraph 1.8 For More Information, for Sidecar Integrated Accessory Cabinet-Tie (SIAC-T) and Sidecar Integrated Accessory Cabinet-Tie Bypass (SIAC-TB) weight and size requirements. Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 28
914.4 mm (36") working space From Back of Cabinet – Seismic Installation From Right Side of Cabinet None Required None Required From Left Side of Cabinet Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 29
UPS Installation Plan and Unpacking Figure 3. UPS Cabinet Dimensions (Front and Right Side Views) Front Right Side Dimensions are in millimeters [Inches] Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 30
UPS Installation Plan and Unpacking Figure 4. UPS Cabinet Dimensions (Top and Bottom Views) Front Bottom Front NOTE: Top exhaust configuration shown. Dimensions are in millimeters [inches] Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 31
Bypass Sidecar Dimensions are in millimeters [inches] NOTE The UPS Front Floor Mounting Bracket’s mounting dimensions are identical to the Rear Floor Mounting Bracket dimensions. Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 32
1880 [ 74.0 ] [ 30.0 ] [ 30.0 ] Front Front UPS With Left-Mounted Sidecar UPS With Right-Mounted Sidecar Dimensions are in millimeterse [Inches] Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 33
Figure 7. UPS Cabinet with Left or Right-Mounted Sidecar Dimensions (Top and Bottom Views) Front Front Front Front Bottom Bottom UPS With Left-Mounted Sidecar UPS With Right-Mounted Sidecar Dimensions are in millimeters [Inches] Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 35
402 (15.8) 496 (1094) Eaton 93PM-100-2 UPS with four breaker SIAC-B Eaton 93PM-100-3 UPS with four breaker SIAC-B 1001 (39.4) 561 (22.1) 412 (16.2) 566 (1248) Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 36
Do not check UPS operation by any action that includes removal of the earth (ground) connection with loads attached. • Refer to national and local electrical codes for acceptable external wiring practices. Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 37
UPS Installation Plan and Unpacking • To allow for future power upgrades, Eaton recommends installing the UPS using wiring and external overcurrent protection breakers sized for the fully rated UPS kW frame size installed instead of the derated kW ordered. Wiring for the maximum kW frame size will allow a full power rating upgrade without having to modify the site wiring infrastructure.
Page 38
For external wiring recommendations, including the minimum AWG size of external wiring, see Table 4 Table 5. Wire sizes listed are for copper wiring only. Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 39
AC Output to Critical Load (Three Wire) Amps Full Load Current (3) Phases, (1) Ground Minimum Conductor Size (Phase A, B, and C) AWG or kcmil Number per Phase (each) Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 40
NOTE Callout letters A, B, C and D map to Figure 43 through Figure NOTE Line-up-and-match battery wiring with a 105°C rating is factory supplied with the Eaton 93PM Integrated Battery Cabinet (IBC). Table 5. Input/Output Ratings and External Wiring Recommendations: Eaton 93PM-100-2 and 93PM-100-3 (N+1) Rating 50/60 Hz...
Page 41
NOTE Callout letters A, B, C and D map to Figure 43 through Figure NOTE Line-up-and-match battery wiring with a 105°C rating is factory supplied with the Eaton 93PM Integrated Battery Cabinet (IBC). The power wiring terminals are pressure terminations, UL and CSA rated. See Table 6 for external power cable terminations.
Page 47
24V, 1A minimum. • Because of the battery shunt trip wiring route in the UPS cabinet, the wire should be rated for a minimum of 600V. Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 48
Alarm relay contacts have a maximum current rating of 5A and a switched voltage rating of 30 Vac or 28 Vdc. • Alarm relay wiring should be a minimum of 18 AWG (recommended 18 AWG). Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 49
Carefully inspect the outer packaging for evidence of damage during transit. CAUTION Do not install a damaged cabinet. Report any damage to the carrier and contact an Eaton service representative immediately. NOTE...
Page 50
Figure 12. UPS Cabinet as Shipped on Pallet Figure 13. UPS Cabinet with Left-Mounted or Right-Mounted Sidecar as Shipped on Pallet UPS with Left-Mounted Sidecar UPS with Right-Mounted Sidecar Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 51
14. Place a floor protector from the parts kit underneath each jacking bolt, and screw the bolts down against them. The floor protectors protect the floor from being marred by the jacking bolts. Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 52
3 mm (1/8") above the floor (just enough to allow the removal of the pallet skids). Failure to follow these instructions can result in serious injury or death. Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 53
12. Remove the cabinet support bolts fastening the front, rear, and side cabinet supports together and remove the side supports (see Figure 14). Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
33. Proceed to paragraph 4.3 Integrated Battery Cabinet Installation. NOTE Black cover dots are provided, if side mounting bracket holes need to be covered for aesthetic reasons. Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
If installing Integrated Battery Cabinets (IBCs), refer to the Eaton 93PM Integrated Battery Cabinet Installation Manual Large and Large High Rate, the Eaton 93PM Universal Integrated Battery Cabinet Installation Manual- Large and Large High Rate, or the Eaton 93PM Integrated Battery Cabinet-Small Welded IBC-SW (432V and 480V) Installation Manual, listed in paragraph 1.8 For More...
I I n n t t e e g g r r a a t t e e d d A A c c c c e e s s s s o o r r y y C C a a b b i i n n e e t t - - T T i i e e If an IAC-T is attached to the UPS, refer to the Eaton 93PM Integrated Accessory Cabinet-Tie (50 kW and 100 kW IAC-T) Installation and Operation Manual, listed in paragraph 1.8 For More...
13. Connect phase A, B, and C bypass input power wiring from the utility source to the bypass input terminals. See paragraph 3.2.2 UPS System Power Wiring Preparation for wiring and termination requirements. For a detailed view of the UPS terminal blocks, see Figure Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 58
AC Input and Output, and DC Input Front Bottom View Top Entry Conduit Landings for Customer NOTE: Remove panels to drill or punch conduit holes. Interface Wiring Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 59
Interface Wiring Bottom Entry Conduit Landing for AC Input and Output, and DC Input Bottom View NOTE: Remove panels to drill or punch conduit holes. Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 60
Left Side View Right Side View Inter-cabinet wiring access knockouts. Remove knockouts as required to route power wiring between cabinets. Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 61
AC Input to UPS Bypass (A, B, C) DC Input from Battery AC Input to UPS Rectifier AC Output to Critical Load (A, B, C) (A, B, C) Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 62
Route and connect the battery cables between the UPS and battery cabinet or battery disconnect according to the instructions in the Eaton 93PM Integrated Battery Cabinet Installation Manual – Large and Large High Rate, the Eaton 93PM Universal Integrated Battery Cabinet Installation Manual-Large and Large...
4.11.4 Generator Interface Connections; if wiring external parallel CAN connections, proceed to paragraph 4.11.5 Installing External Parallel CAN Control Wiring and Connections; Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 64
Minislot Communication Bay 1 Minislot Communication Bay 4 Pull Chain and Host USB Relay Output Terminals CAN Terminals Device USB REPO Terminals Building Alarm Terminals RS-232 Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 66
Building Alarm 3 (0.22-0.25 Nm) dry contact closure #18 AWG Return Building Alarm 4 Building Alarm 4 Return Building Alarm 5 Building Alarm 5 Return Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 67
If installing interface wiring connections between standalone cabinets, conduit must be installed between cabinets. NOTE 5 Disconnect terminal block plugs from terminal blocks to wire plugs. Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 68
Step 6; if wiring the battery interface connections using top entry access, proceed to Step 12. Refer to the Eaton 93PM Integrated Battery Cabinet Installation Manual – Large and Large High Rate, the Eaton 93PM Universal Integrated Battery Cabinet Installation Manual-Large and Large High Rate, the Eaton...
Page 69
Step 8; if wiring the battery shunt trip connections using top entry access, proceed to Step 10. Refer to the Eaton 93PM Integrated Battery Cabinet Installation Manual – Large and Large High Rate, the Eaton 93PM Universal Integrated Battery Cabinet Installation Manual-Large and Large High Rate, the Eaton...
Page 70
14. If removed, reinstall the sidecar front panel and secure with the retained hardware. 15. Close the UPS outside door and secure the latch. Figure 28. Battery Shunt Trip Location Shunt Trip Terminals Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 71
2 lb in Pair Wires #14-#30 AWG battery breaker or disconnect (0.22-0.25 Nm) 48 Vdc Battery #18 AWG Shunt Trip – Not Used Not Used Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 72
11. Route the wiring along the interface wiring channel to the UPS building alarm terminals. See Figure 22 Figure 23 for UPS interface terminal locations. Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 73
14. Route the external parallel CAN control wiring through the top interface entry conduit landing plate to the UPS external parallel terminals. See Figure 22 Figure 23 for UPS interface terminal locations. Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 74
Use twisted-pair wires for each input and return or common. Strip wire 0.4 (3.5) - 0.8 (7.1) Pull Chain #26–#16 Slotted insulation back 10 millimeters to wire terminal blocks. Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 75
Figure 32. External Parallel Terminal Block Pull Chain Ground_S CAN H In CAN L In External Ground (ISP) Parallel TB Earth CAN H Out CAN L Out Ground (ISP) Earth Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 76
16. If wiring Minislot connections, proceed to paragraph 4.11.7 Installing Minislot Interface Connections; if wiring REPO connections, proceed to paragraph 4.12 Installing a REPO Switch; otherwise, proceed to Step 17. Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 78
Remove the cabinet stiffener bar (see Figure 23) before installing or removing Minislot cards. Reinstall the bar after the procedure is completed. For installation and setup of a Minislot card, contact an Eaton service representative (see paragraph 1.9 Getting Help). To install wiring: If not already installed, install the LAN drop.
Page 79
Remove the bottom interface entry conduit landing plate to drill or punch holes (see Figure 24). 10. Reinstall the interface entry plate and install the conduit. Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 80
34). The REPO switch wiring must be in accordance with NEC Article 725 Class 2 requirements. 18. Close the UPS outside door and secure the latch. Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 82
Chapter 11 Warranty for details. This service is offered as part of the sales contract for the UPS. Contact an Eaton service representative in advance (usually a two-week notice is required) to reserve a preferred startup date. Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 83
Accessories are mounted in installed locations and wiring is terminated inside the UPS cabinet. (Optional) o Air conditioning equipment is installed and operating correctly. o The area around the installed UPS system is clean and dust-free. (Eaton recommends that the UPS be installed on a level floor suitable for computer or electronic equipment.) o Adequate workspace exists around the UPS and other cabinets.
Page 85
Inverter Switchgear Switchgear AC Input to Rectifier/ Charger Power Module Digital Metering AC Output AC Input to Static to Critical Switch Bypass Load Bypass Switchgear Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 86
The following paragraphs describe the differences in the UPS operating modes, using block diagrams to show the power flow during each mode of operation. Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 87
Switch Rectifier Input Output Rectifier Inverter Rectifier Inverter Switchgear Switchgear Battery Converter Main Power Flow Battery Switchgear Switchgear Trickle Current Closed Energized Open De-Energized Battery Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Switch Rectifier Input Output Rectifier Inverter Rectifier Inverter Switchgear Switchgear Battery Converter Main Power Flow Battery Switchgear Switchgear Trickle Current Closed Energized Open De-Energized Battery Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 91
Figure 46 93PM UPS with a 4 Reverse transfer UPS with up to 3 UPMs with four breaker bypass Breaker SIAC-B and external battery Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
The following paragraphs describe the UPS control panel, including controls and indicators, and how to monitor UPS operation. The control panel is shown in Figure Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
The four symbols on the bottom of the control panel are status indicators. These colored light emitting diode (LED) lamps work with the alarm horn to provide the operating status of the UPS. Table 20 describes the status indicators. Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 99
All functions and commands are accessed by touching or tapping the screen tabs or buttons. When text input is required, either a Qwerty keyboard or numeric keypad will be displayed. Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
The UPS navigation tab menu bar allows you to display data in the information area to help you monitor and control UPS operation. Table 21 shows the basic menu structure. Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
7 7 . . 2 2 . . 6 6 D D i i s s p p l l a a y y M M e e n n u u O O p p e e r r a a t t i i o o n n Table 22 describes the menu functions and how to use them. Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 102
Configurable system settings. Tap the SETTINGS tab on the main menu navigation bar to display the settings screen. Settings may be password restricted. Settings Level 2 default password is 0101. Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Tap the desired statistic button to display the detailed statistic screen. Controls See paragraph 7.2.8 System Controls for details. Figure 51. Typical Meters Summary Screen Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
To prevent inadvertent or unauthorized power disruption to the critical load or auxiliary lighting system, change the Level 1 and Level 2 default passwords when system commissioning startup is performed. To Sign in: Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Level 1 default password is 1111. Settings Level 2 default password is 0101. Sign in is complete. Tap continue to return to previous screen. Figure 60. Sign In Password Screen Figure 61. Sign In Keypad Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 109
RUN BATTERY TEST starts the battery test. Table 24. Typical System Status Messages Message Function Double Conversion; Bypass; ESS Bypass Off; On; Available Charger Charger Resting; Charger Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Power is now supplied to the critical load in dual conversion mode. It takes approximately one minute for the UPS to achieve the dual conversion mode. Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 113
7 7 . . 3 3 . . 4 4 S S t t a a r r t t i i n n g g a a S S i i n n g g l l e e U U P P M M To Start a single UPM: Close the UPS input feeder circuit breaker. Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 114
Tap the EAA CONTROLS tab on the secondary Control menu navigation bar. The EAA CONTROLS screen is displayed. Tap the DISABLE ESS button. The UPS transfers to Double Conversion mode. Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 115
Tap the SHUT DOWN MODULE button. The UPM status indicates SHUTDOWN. The power module is turned off. The remaining UPMs continue to supply the critical load. Logic power remains on. Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 116
72 hours of the start of a charging cycle. The command will not be shown if the test is not able to be run. Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 117
UPS output. The REPO switch de-energizes the critical load and powers down the UPS immediately, without asking for verification. The UPS, including Bypass, remains off until restarted. Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Wait at least 5 minutes before accessing internal components. Figure 67. REPO Operation Activated Deactivated (Pushbutton locked into place.) (Unlock pushbutton to release.) Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 119
Verify no alarms are active. Tap the CONTROLS tab on the main menu navigation bar. The System Control screen is displayed. Tap the GO TO BYPASS button. Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 120
7 7 . . 4 4 . . 5 5 T T r r a a n n s s f f e e r r f f r r o o m m D D o o u u b b l l e e C C o o n n v v e e r r s s i i o o n n t t o o B B y y p p a a s s s s M M o o d d e e To transfer the critical load to Bypass mode: Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 121
7 7 . . 4 4 . . 9 9 T T r r a a n n s s f f e e r r f f r r o o m m D D o o u u b b l l e e C C o o n n v v e e r r s s i i o o n n t t o o B B y y p p a a s s s s M M o o d d e e a a n n d d S S h h u u t t D D o o w w n n a a l l l l U U P P M M s s To transfer the critical load to Bypass mode and shut down the UPMs: Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 122
7 7 . . 4 4 . . 1 1 2 2 S S i i n n g g l l e e U U P P S S S S h h u u t t d d o o w w n n To Shutdown a single UPS: Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 123
Perform the Load Off procedure in paragraph 7.4.17 Using the LOAD OFF Command. The inverter and bypass switchgear open, and the power module is turned off on all UPSs. Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 124
The UPSs (including Bypass) remains off until restarted. To use the LOAD OFF command: Tap the CONTROLS tab on the main menu navigation bar. The System Control screen is displayed. Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 125
To use the REPO switch: Firmly push the red pushbutton until it locks into place. The switch latches into the activated state (see Figure 67). Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 126
Power is present inside the UPS cabinet until the upstream input feeder circuit breakers and battery breakers are opened. Wait at least 5 minutes before accessing internal components. Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 127
The UPS system requires very little preventive maintenance. However, the system should be inspected periodically to verify that the units are operating normally and that the batteries are in good condition. Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 128
The foam filters are to be replaced with new or washed filter immediately. The UPS is not meant to be run without filters installed. Close the front door and secure the latch Record maintenance results and any corrective actions in a suitable log. Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
8 8 . . 2 2 . . 4 4 A A N N N N U U A A L L M M a a i i n n t t e e n n a a n n c c e e Annual preventive maintenance should be performed only by authorized service personnel familiar with maintenance and servicing of the UPS system. Contact an Eaton service representative for more information about service offerings.
Page 130
Phillips and Pozidriv are registered trademarks of Phillips Screw Company. A basic training course, available from Eaton, gives you a competent working knowledge of the UPS system Copyright 2008–2010 Eaton Corporation, Raleigh, NC, USA. All rights reserved. No part of this document may be reproduced in any way without the express written approval of Eaton Corporation.
IRC-MS installation guide. One input can be activated by a switch or dry contact. The voltage source is provided by the card, no external voltage source is needed. For installation and setup of a Minislot card, contact an Eaton service representative. Refer to the manual supplied with the Minislot card for user instructions.
Page 132
It’s also powered by CA Technologies, bringing together the best in hardware and software. PredictPulse Service is included at no charge during the first year of Eaton 93PM UPS operation (warranty period) along with the required connectivity parts. Beyond that, it may be purchased with Eaton Support Agreements or as a standalone subscription after the initial warranty expires.
Page 133
Real-time alarm events for all subscribed devices via the PredictPulse mobile app (Apple and Android). You can track all alarms by device. As critical alarms occur, Eaton will acknowledge them so you know when Eaton has diagnosed the alarm (and pending notification of resolution).
Page 134
Communication Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 135
Input Current Harmonic Content 3% THD at full load Power Factor Minimum 0.99 Line Surges 6 kV OC, 3 kA SC per ANSI 62.41 and IEC 801 4 Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 136
Meets IEC 61000-4-2 Level 3 specifications. Withstands up to 4 kV contact pulse without damage and with no disturbance or adverse effect to the critical load. Immunity Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Page 137
For warranty information, please refer to the Resources link on our website, www.eaton.com/93PM. EQUIPMENT REGISTRATION Please visit www.eaton.com/pq/register to register your new Eaton UPS / Eaton UPS Accessory. Model Number: Serial Number: Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07...
Need help?
Do you have a question about the 93PM Series and is the answer not in the manual?
Questions and answers