4.6. UPS System Installation (600 kW)
4.6.1.
Mechanically joining the Cabinet Sections
•
For the following steps, verify that the forklift or pallet jack is rated to handle the
weight of the cabinet (see
•
Do not tilt the UPS cabinets more than 10° from vertical or the cabinets may tip over.
1. Remove the front and rear baffle Plates of the UPS cabinets. Please keep the baffle Plates
and screws for later use;
See
Figure 2-3
2. Use the holes on the feet. Place the UPS cabinets on the ground or channel steel;
See
Figure 3-4
contact customer service to provide;
3. Fix the cabinet foot to the floor or channel steel, reinstall the baffle Plates, and use the
M10*25 bolt (16pc)/M10 spring washer (16pc)/M10 large flat washer (16pc) removed in step
1 to fix it. Torque: 28 Nm;
4. If installing a parallel system, repeat the above steps to all units in the system;
5. Proceed to Section
Copyright © 2021 Eaton Corporation plc. All rights reserved.
NOTE
Table 3-1
for the location of the baffle Plates;
and
Figure 3-5
bottom view for hole dimensions, For more detailed installation drawings, please
4.6.2
.
Installation and Operation Manual
Dimensions and Weights ).
Eaton 93PR 60-1200 kW UPS
51