4.6. UPS System Installation (600 kW)

4.6.1.

Mechanically joining the Cabinet Sections

For the following steps, verify that the forklift or pallet jack is rated to handle the
weight of the cabinet (see
Do not tilt the UPS cabinets more than 10° from vertical or the cabinets may tip over.
1. Remove the front and rear baffle Plates of the UPS cabinets. Please keep the baffle Plates
and screws for later use;
See
Figure 2-3
2. Use the holes on the feet. Place the UPS cabinets on the ground or channel steel;
See
Figure 3-4
contact customer service to provide;
3. Fix the cabinet foot to the floor or channel steel, reinstall the baffle Plates, and use the
M10*25 bolt (16pc)/M10 spring washer (16pc)/M10 large flat washer (16pc) removed in step
1 to fix it. Torque: 28 Nm;
4. If installing a parallel system, repeat the above steps to all units in the system;
5. Proceed to Section
Copyright © 2021 Eaton Corporation plc. All rights reserved.
NOTE
Table 3-1
for the location of the baffle Plates;
and
Figure 3-5
bottom view for hole dimensions, For more detailed installation drawings, please
4.6.2
.
Installation and Operation Manual
Dimensions and Weights ).
Eaton 93PR 60-1200 kW UPS
51