Eaton 93PR Installation And Operation Manual page 55

Table of Contents

Advertisement

NOTE
For the following steps, verify that the forklift or pallet jack is rated to handle the weight of the
Table 3-1
cabinet (see
Do not tilt the UPS cabinets more than 10° from vertical or the cabinets may tip over.
3. Use a hammer to pry open the metal connection components around the wooden box, remove the
wooden box, cushioning materials and moisture-proof bag (
4. Remove the screws fixed the L-shaped parts around the cabinet and remove the L-shaped parts (
4-4
), Please reinstall the 8 screws removed before back to the cabinet feet. Please retain the shipping
parts and fixing parts for future use.
5. Insert the fork into the bottom of cabinet from the side (
NOTE
To prevent damage to the wiring channel and wiring in the UPS cabinet base when lifting or
moving the cabinet:
Lift and move the cabinet using only the front or rear forklift slots.
Verify that the forklift forks are in a horizontal position before inserting them into the forklift
slots. DO NOT angle fork tips upward.
Insert the forks all the way through the base. DO NOT insert forks partially into the base to
move the cabinet.
Forks may be partially inserted into the front or rear forklift slots for minor positioning if the
forks are kept in a horizontal position with no upward angling.
DO NOT use the forklift slots on the end of the cabinet to move the cabinet.
End forklift slots may be used for minor positioning if the forks are kept in a horizontal
position with no upward angling.
If these instructions are not followed, damage to the wiring channel and wiring will occur.
6. Using the forklift, move the UPS cabinet to the final installed location.
7. Install the UPS system. Please follow Section
follow Section
NOTE
While waiting for installation, protect the unpacked cabinet from moisture, dust, and other harmful
contaminants. Failure to store and protect the UPS properly may void your warranty.
Copyright © 2021 Eaton Corporation plc. All rights reserved.
Dimensions and Weights ).
4.7
for 1200kW UPS.
Figure 4-1
~
Figure 4-5
).
4.5
for 300kW UPS; follow Section
Eaton 93PR 60-1200 kW UPS
Installation and Operation Manual
Figure 4-3
).
Figure
4.6
for 600kW UPS;
43

Advertisement

Table of Contents
loading

This manual is also suitable for:

93pr-30093pr-60093pr-1200

Table of Contents