Checking and Powering-Up
This chapter explains how to check that you are ready and then perform the initial power up.
Before proceeding to this chapter, you should first complete the procedures in:
and before that, the procedures in either:
and before that, the procedures in either:
Before operating the BPX switch, verify that the following procedures have been performed:
The BPX switch is connected to an appropriate power source with an isolated ground connection,
Step 1
according to the procedures in Chapter 10, Installing the DC Shelf or Chapter 11, Installing the AC
Shelf, as applicable.
Step 2
The BPX switch power cord is plugged into an appropriate power outlet.
Step 3
The full complement of cards for the specific node are mounted in the correct slots, correctly seated,
and locked in place.
Step 4
The T3 or E3 connections are attached appropriately.
A control terminal (or Cisco WAN Manager Work Station) is connected to the CONTROL port on the
Step 5
LM-BCC in back slot 7/8, and the terminal's power cord plugged into the appropriate voltage wall
outlet.
Step 6
If desired, a printer is connected to the AUXILIARY port on the LM-BCC in back slot 7/8 and the
printer power cord is plugged into the appropriate power outlet.
Release 9.3.0, Part Number 78-10674-01 Rev. D0, July 2001
Chapter 15, Connecting Temporary Terminal and Attaching Peripherals
Chapter 14, Connecting Cables
Chapter 13, Installing the BPX Switch Cards
Chapter 10, Installing the DC Shelf
Chapter 11, Installing the AC Shelf
and
Chapter 12, Installing the T3/E3 Cable Management Tray
Chapter 8, Installation with Cisco Cabinets including 7000 Series Routers
or
Chapter 9, Installation in Customer Cabinet
C H A P T E R
Cisco BPX 8600 Series Installation and Configuration
16
16-1