Nortel CallPilot 703t Maintenance And Diagnostics page 155

Hide thumbs Also See for CallPilot 703t:
Table of Contents

Advertisement

January 2007
8
Reinstall the fans (if removed) and upper fan holder foam.
9
Reinstall the server side cover.
10
Reconnect the peripheral device and power cables.
11
Power up the server.
12
Rebuild the drive in the RAID system pack.
The rebuild copies the data from the operating hard drive to the new
hard drive. For instructions, see Chapter 10, "RAID operations."
Result: Hard drive replacement is complete.
703t Server Maintenance and Diagnostics
For instructions on reinstalling the fans, see "Install front system
fan" on page 136.
For instructions on replacing the upper fan holder foam, see "To
replace the upper fan holder foam" on page 128.
Replacing media drives
155

Advertisement

Table of Contents
loading

Table of Contents