Mounting The Single Canopy; Preparing The Installation Of The Canopy; Mounting The Canopy Halves - Nuvo Navigator Lift 150 Single Installation Instructions Manual

Table of Contents

Advertisement

14
Mounting the Canopy, Cover Caps and the Cover Panels
Figure 46: Preparing the installation of the canopy
Figure 47: Mounting the canopy halves

14.2 Mounting the Single canopy

14.2.1 Preparing the installation of the canopy

(See "Figure 46")
The Figure shows a simplified illustration of the interface plate without ca-
bles and without the extension arm or motor arm.
1.
Screw the hexagonal nuts M10① onto the threaded bolts M10 x
360mm②.
2.
Screw the threaded bolts M10 x 360mm② into the interface plate
in such a way that the canopy halves mounted afterwards are
1
flush with the intermediate ceiling / prefabricated ceiling (see ""Fig-
ure 15: page 31").
If an interface plate
is mounted to the raw ceiling, the threaded
1
bolts M10 x 360mm② must be cut to length accordingly.
Risk of canopy dropping
The canopy can drop if the fixing elements have not been
properly tightened:
• Tighten the 4 hexagonal nuts M10① to 46Nm.
3.
Check that the threaded bolts M10 x 360mm② are securely in place:
The threaded bolts M10 x 360mm② must be mounted at the same
distance to the interface plate
The 4 hexagonal nuts M10① must be tightened to 46Nm.

14.2.2 Mounting the canopy halves

(See "Figure 47")
The Figure shows a simplified illustration of the interface plate without ca-
bles and without the extension arm or motor arm.
1.
Place the sectional strip (not illustrated in the Figure) onto the first
canopy half② (the canopy can be optionally sealed with silicone).
2.
Place the first canopy half② onto the threaded bolts M10 x
360mm① and then screw in and tighten the 2 cover screws③.
3.
Check that the canopy half② is flush with the intermediate ceiling /
prefabricated ceiling.
If required, readjust the 4 threaded bolts M10 x 360mm as described
in Chapter 14.2.1 on Page 67.
4.
Place the sectional strip (not illustrated in the Figure) onto the sec-
ond canopy half④ and push it into the first canopy half② in such a
way that they engage tightly with each other.
5.
Place the second canopy half④ onto the threaded bolts M10 x
360mm① and then screw in and tighten the 2 cover screws③.
6.
Screw 1 sheet metal screw each⑤ into the 2 straps⑥ on the oppo-
site outer faces of the canopy halves②/④.
7.
Screw in and tighten 4 sheet metal screws each⑦ to the bottom
ends of the canopy halves ②/④.
8.
Check that the canopy halves① are securely in place:
The canopy halves②/④ must engage tightly with each other.
The canopy must be fully flush with the intermediate ceiling / prefab-
ricated ceiling.
All fixing screws③/⑤/⑦ must be tightened.
67
WARNING
.
1
1568911, Edition 2019-04, Version 0
EN

Advertisement

Table of Contents
loading

Table of Contents