Mitsubishi Electric M800W Series Connection And Set Up Manual page 339

Hide thumbs Also See for M800W Series:
Table of Contents

Advertisement

M800W/M80W Series Connection and Setup Manual
11 Connection of Operation Panel I/O Unit
(2) Connecting with 12V manual pulse generator (maximum cable length: 50m)
Connect the 12V manual pulse generator to the connector MPG.
Operation panel
I/O unit
MPG
(Note 1) When selecting a manual pulse generator, make sure that its case and 0V terminal are insulated.
(Note 2) Select 25pulse/rev or 100pulse/rev on the parameter screen.
<Related items>
Cable drawing: "Cable: J020/J021/J022 Cable" and "Cable: J023/J024/J025 Cable"
Connector pin assignment: "General Specifications: Operation Panel I/O Unit" (MPG connector)
IB-1501268-K
When connecting one
12V manual pulse
generator
J020
When connecting two
12V manual pulse
generators
J021
When connecting three
12V manual pulse
generators
 J022
300
NO.1
12V manual pulse
12V 0V
A
B
HD60C (Rear view)
NO.2
NO.1
12V 0V A
B
12V 0V A
NO.3
NO.2
12V 0V A
B
12V 0V A
B
generator
B
NO.1
12V 0V A
B

Advertisement

Table of Contents
loading

This manual is also suitable for:

M80w seriesM850wM830wM80w

Table of Contents