12.16
Removing the shock absorber
–
Mount and tighten screws
Guideline
Remaining screws,
chassis
S04424-11
Finishing work
–
Install the headlight mask with the headlight. (
–
Check the headlight setting. (
Preparatory work
–
Raise the motorcycle with a lift stand. (
Main work
–
Remove the cable tie.
–
Remove screws
S04430-10
–
2
Remove screw
–
3
Remove fitting
Info
Raise the link fork slightly to be able to remove the screws
more easily.
S04427-10
–
Press angle lever
–
Press linkage lever
S04428-10
SERVICE WORK ON THE CHASSIS 12
2
.
M6
10 Nm (7.4 lbf ft)
p. 108)
p. 52)
1
and the frame protector.
.
.
4
toward the rear.
5
downward.
p. 106)
61