Section 4-2 General Procedures; Power On/Boot Up; System Boot-Up/Shutdown; Lockout/Tagout Requirements (For Usa/Europe) - GE LOGIQ 100 PRO Technical Publication

Table of Contents

Advertisement

GE H
EALTHCARE
D
5305880-100, R
IRECTION

Section 4-2 General Procedures

4-2-1

Power On/Boot Up

Note:
After turning off the system, wait at least ten seconds before turning it on again. The system may
not be able to boot if power is recycled too quickly.
CAUTION
SYSTEM REQUIRES ALL COVERS
Operate this unit only when all board covers and frame panels are securely in place. The
covers are required for safe operation, good system performance and cooling purposes.
4-2-1-1

System Boot-UP/Shutdown

Purpose: This is a description on how to Shut Down/Power-UP the system.
4-2-1-2

Lockout/Tagout Requirements (For USA/Europe)

Follow OSHA Lockout/Tagout requirements by ensuring you are in total control of the plug.
4-2-1-3

Power Up

1.) Connect the Power Cable at the rear of the System.
2.) Connect the Power cable to an appropriate mains power outlet .
Figure 4-1 Mains Circuit Breaker and Mains Power Cable
Page 4-2
Ap p r o v e d Do c u m e n t - 5 3 0 5 8 8 0 - 1 0 0 T PH_ r 3 . p d f Pa g e 7 7 o f 1 9 7
3
EVISION
Mains Power
Cable Connector
Section 4-1 - Overview
LOGIQ™ 100 PRO S
Circuit Breaker
M
ERVICE
ANUAL

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the LOGIQ 100 PRO and is the answer not in the manual?

Table of Contents