Chapter 3 Installation; Section 3-1Overview; Purpose Of Chapter 3; Average Installation Time - GE LOGIQ 100 PRO Technical Publication

Table of Contents

Advertisement

GE H
EALTHCARE
D
5305880-100, R
IRECTION

Chapter 3 Installation

Section 3-1Overview

3-1-1

Purpose of Chapter 3

This chapter contains information needed to install the unit. Included are references to a procedure
that describes how to receive and unpack the equipment and how to file a damage or loss claim.
How to prepare the facility and unit of the actual installation, and how to check and test the unit,
probes, and external peripherals for electrical safety are included in this procedure. Also included
in this section are guidelines for transporting the unit to a new site.
CONTENTS IN CHAPTER 3
Table 3-1 Contents in Chapter 3
Section
3-1
3-2
3-3
3-5
3-6
3-7
3-1-2

Average Installation Time

Description
Unpacking the scanner
Scanner wo/options
Table 3-2 Average Installation Time
Ap p r o v e d Do c u m e n t - 5 3 0 5 8 8 0 - 1 0 0 T PH_ r 3 . p d f Pa g e 4 6 o f 1 9 7
3
EVISION
Description
Overview
Receiving and Unpacking the Equipment
Preparing for Installation
Completing the Installation
System Configuration
Paperwork
Average
Installation
Time
20 Minutes
40 Minutes
Chapter 3 - Installation
LOGIQ™ 100 PRO S
Comments
Dependant on the configuration that
is required
M
ERVICE
ANUAL
Page Number
3-1
3-3
3-5
3-6
3-17
3-28
Page 3-1

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the LOGIQ 100 PRO and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents