3Com CoreBuilder 7000 Operation Manual page 90

Atm switches
Hide thumbs Also See for CoreBuilder 7000:
Table of Contents

Advertisement

90
C
4: P
HAPTER
RIVATE
A.1.1
A.1.2
A.1.3
A.1.5
A.1.6
Source
Destination
Crankback Path
N
-
-N
I
ETWORK
TO
ETWORK
NTERFACE
The signal between nodes A.2.3 and A.2.2 has failed. A.2.3 will send a
PTSE message that will be flooded to all nodes in the network. At the
same time, it will crankback the signal to the source, so that an alternate
route can be chosen. Figure 29 shows the crankback path.
A.1.4
A.1.8
A.1.7
A.2.3
Figure 29 Crankback Path Back to the Source
In Figure 29, the signal cranked back 6 hops. These hops are decreased
from the hop counter. Node A.1.1 will choose a new path and update its
topology database.
The new topology database information is transmitted as a PTSE message
as described previously. After the topology databases are updated, an
alternate route is chosen. Figure 30 shows the path that node A.1.1 has
chosen after crankback. The alternate route is established and the data is
sent.
(PNNI) V
1.0
ERSION
A.2.0
A.1.9
A.2.5
A.2.1
A.2.2
A.2.4
X
Place Where Link Failed
Chosen Path to Take
Physical Link
A.2.7
A.2.6

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CoreBuilder 7000 and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Corebuilder 7000 series

Table of Contents