Switching The Metering Point; Specifying The Metering Point For Input Channels; Specifying The Metering Point For Output Channels - Yamaha DSP5D Owner's Manual

Digital mixing console/digital mixing system
Hide thumbs Also See for DSP5D:
Table of Contents

Advertisement

Switching the metering point

The metering point for the level meters (i.e., the position at which the level is detected) can be specified separately for input
channels and output channels.
Specifying the metering point for
input channels
Here's how to specify the metering point for input chan-
nels and ST IN/FX RTN channels.
1
In the DISPLAY ACCESS section, repeatedly
press the [METER] key to access the INPUT
METER screen.
INPUT METER
METERING POINT box
2
Click the
/
buttons at the left and right of
the METERING POINT box to choose one of
the following metering points.
PRE ATT
Immediately before the attenuator
PRE GATE
Immediately before the internal gate
PRE FADER
Immediately before the fader
POST FADER
Immediately after the fader
POST ON
Immediately after the [ON] key
Specifying the metering point for
output channels
Here's how to specify the metering point for output chan-
nels, MONITOR channels, and the CUE bus.
Hint
The metering point setting for the CUE bus is independent
from the other output channels.
1
In the DISPLAY ACCESS section, repeatedly
press the [METER] key to access the OUTPUT
METER screen.
2
To specify the metering point for output chan-
nels and MONITOR channels, click the
buttons at the left and right of the METERING
POINT box to choose one of the following.
PRE EQ
PRE FADER
POST FADER
POST ON
POST DELAY
3
To specify the metering point for the CUE bus,
click the
the CUE METERING POINT box to choose one
of the following.
PRE DELAY
POST DELAY
PM5D/PM5D-RH V2 / DSP5D Owner's Manual
OUTPUT METER
METERING POINT
box
Immediately before the EQ
Immediately before the fader
Immediately after the fader
Immediately after the [ON] key
Immediately after the internal delay
/
buttons at the left and right of
Immediately before the internal delay
Immediately after the internal delay
Operating section
CUE METERING POINT
box
/
13
109

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pm5d-rh v2Pm5dPm5d-rhPm5d v2Pm5d-ex

Table of Contents