Omron SYSMAC FH Series User Manual page 296

Vision sensor vision system
Hide thumbs Also See for SYSMAC FH Series:
Table of Contents

Advertisement

Measurement initialization priority
Communication
Select the type of Communications Module to determine the communications method to use for
communications between the Sensor Controller and external device.
Refer to the
for details on how to select the Communications Module.
Item
Serial (Ethernet)
Serial (RS-
232C/RS-422)
Parallel
Fieldbus
Remote
Operation
294
Setting the Operating Environment of the System
Set value
Item
[Factory default]
[Measurement
trigger receipt
priority]
Processing of re-
drawing on screen
priority
Vision System FH/FZ5 Series User's Manual for Communications Settings (Cat No. Z342)
Set value [Factory default]
• [Normal (UDP)]
• Normal (TCP)
• Normal (TCP Client)
• Normal (UDP)
(Fxxx series method)
• PLC Link
(SYSMAC CS/CJ/CP/One)
• PLC Link
(MELSEC QnU/Q/QnAS)
• PLC Link (JEPMC MP)
• [Normal]
• Normal (Fxxx series method)
• PLC Link
(SYSMAC CS/CJ/CP/One)
• PLC Link
(MELSEC QnU/Q/QnAS)
[Standard Parallel I/O]
• [OFF]
• EtherCAT
• EtherNet/IP
• [ON]
• OFF
Measurement initialization is performed immediately after
changing the scene or editing the flow. You can specify
whether measurement trigger reception or display refresh
processing has priority during measurement initialization.
Measurement trigger reception is given priority even during
measurement initialization processing. Displays for display
refresh processing may be incomplete because of its
lowered priority status.
Processing of refreshing the display is given priority.
Measurement triggers will not be received until display
refresh processing is completed.
Specify the Communications Module.
Serial/Ethernet
Normal/Normal (Fxxx series method): Communications are
performed with external devices through [non-procedure]
communications.
For differences between [Normal] and [Normal (Fxxx series
method)], refer to the following note.
PLC Link: Communications are performed through link areas
with the PLC.
Parallel
Standard Parallel I/O: Communications are performed with a
standard parallel interface.
Fieldbus: Communications are performed through EtherCAT
communications and the EtherNet/IP interface. EtherCAT is
supported only by the FH-series Controllers.
Remote operation: The Controller is operated from an external
device.
WWW.NNC.IR
Description
Description
Vision System FH/FZ5 Series
User's Manual (Z340)

Advertisement

Table of Contents
loading

Table of Contents