Installing the top cover
The top cover is present only for 2U HPE ProLiant e910 Server Blade.
Procedure
1. Install the top cover.
2. Install the 2U server blade in the chassis.
3. Power up the server blade.
Removing the air baffle for 1U server blade
This air baffle is installed in the 1U server blade.
20
Operations