13. Connect the PTT switch coupler b, and
then install it to the bracket x.
14. Connect the SPS coupler c, and then
install it to the bracket y.
c
y
b
15. Connect the extension wiring harness
coupler d, and then fasten it using the
plastic tie z.
d
16. Install the PTT motor leads e and f,
and then tighten the PTT motor lead
bolts A to the specified torque.
17. Install the caps B.
w
v
x
z
Power unit assembly
e
A
PTT motor lead bolt A:
4 N·m (0.4 kgf·m, 3.0 ft·lb)
18. Install the shift lever C, and then install
the clip D.
C
D
19. Install the battery cable E.
20. Install the rigging grommet F, and then
install the grommet holder G.
F
B
0
B
f
1
2
3
4
5
6
7
E
8
9
10
G
A
7-12