FusionModule5000 Smart Modular Data Center
Maintenance Guide (ECC800)
1.
2.
Figure 5-67 Assembling a pad power connector holder (BOM number: 14190892)
Figure 5-68 Assembling a pad power connector holder (BOM number: 14190242)
Step 5 Connect cables from the power connector to the AC actuator, and route the cables, as shown
in the following figures.
Issue 01 (2019-03-05)
Clamp the power connector to the guide rail of the holder.
Install the holder cover using three M4x12 screw assemblies.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5 Parts Replacement