After the blinking succeeds, click Stop to stop blinking.
After the blinking succeeds, click Stop to stop blinking.
Step 6 Repeat
networked.
After all faulty BIMs are replaced, the ALM indicator on the CIM turns off.
Step 7 Press the CIM networking switch for 2 seconds. When the RF_Z indicator on the CIM turns
from blinking green at super short intervals to blinking green at long intervals, the
replacement is complete. If
in this section.
Issue 01 (2019-03-05)
The BIM blinking function is not required on the ECC WebUI.
On the UPS WebUI home page, choose Monitoring > Control > CIM Control, set
CIM No. and BIM No., and then click Start.
Figure 5-56 Setting the BIM blinking function on the UPS WebUI
On the UPS LCD home screen, choose System Info > Maintenance > CIM Control,
set CIM No. and BIM No., and then click Start.
Figure 5-57 Setting the BIM blinking function on the UPS LCD
Step 3
to
Step 5
until all the BIMs to be replaced are successfully installed and
Step 5
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
fails, replace the BIM again by following the instructions
5 Parts Replacement