Table 2-3 Semi-annual maintenance
System
Structure
system
Cooling
system
Issue 01 (2019-03-05)
Component
Integrated UPS
New main way
NetCol5000-C 30 kW
chilled water in-row
precision air conditioner
BIB, CIM, and BIM
Smoke detector
Alarm beacon
Component
Skylight tempered glass
NetCol5000-C 30 kW
chilled water in-row
precision air conditioner
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
2 Routine Maintenance
Item
humidity of the PDC.
Cleanness
Parameter configuration
Status record
Check whether battery screws are tightened.
Cables between batteries
Battery voltage
Perform a shallow discharge test
(recommended).
Check the exterior of the new main way
component.
Check the operating temperature and
humidity of the new main way.
Water injection is smooth.
Drainage is smooth.
The electric heater generates heat.
The chilled water valve handle automatically
rotates to the maximum opening.
Check the battery management parameter
setting.
Check the CIM connection.
Checkthe BIM connection.
Check the indicator on the smoke detector.
Check that the alarm beacon works properly.
Item
Clean the skylight steel glass. Clean the glass
using a piece of soft cotton cloth.
Check that no foreign matter exists in the
fan.
Verify that the fan blades are intact.
Check that no abnormal noise is generated
when the fan is running.