Name
Pad power connector holder
Procedure
Step 1 Remove the pad power connector and its holder from the door box, as shown in
Figure 5-62 Removing a pad power connector holder and its holder
Step 2 Disconnect cables from the power connector, as shown in the following figures.
Figure 5-63 Disconnecting cables from the power connector (BOM number: 14190892)