Installing The Cl-55 Modem - Toro GeoLink CL-55 Installation Instructions Manual

Modem kit, multi pro 1750 or 5800 turf sprayer
Table of Contents

Advertisement

Figure 80
1. Fuse block
3.
Secure the switched power and ground branch
of the kit wire harness to the machine wire
harness with 5 cable ties.
16

Installing the CL-55 Modem

Parts needed for this procedure:
CL-55 modem—GeoLink precision spray system kit
1
(Model 41633 or Model 41634)
1
Modem bracket
Capscrew (#10-24 x 1-1/2 inches)
Spacer (1/4 x 3/4 inch)
2
Locknut (#10-24)
Preparing the Machine
Multi Pro 5800 Machines
1.
Remove the 2 flange locknuts (5/16 inch) and
2 flange-head bolts (5/16 x 1 inch) that secure
the air-cleaner mount to the right seat-box panel
(Figure
81).
g301672
2. Fuse (10 A)
1. Flange locknut (5/16
inch—coolant reservoir
bracket)
2. Capscrew (5/16 x 3/4
inch—rear position only,
coolant reservoir bracket)
2.
Remove the rear flange locknut (5/16 inch) and
capscrew (5/16 x 3/4 inch) that secures the
coolant reservoir bracket to the right seat-box
panel
(Figure
Connecting the Antenna Harness
to the Modem
1.
Plug the coaxial connector of the
modem-antenna harness labeled W
into the coaxial port of the CL-55 modem marked
W
/BT, and tighten the coaxial connector
IFI
(Figure
82).
30
Figure 81
3. Flange locknut (5/16
inch—air-cleaner mount)
4. Flange-head bolt (5/16 x 1
inch—air-cleaner mount)
81).
IFI
g310541

Advertisement

Table of Contents
loading

This manual is also suitable for:

4163841639

Table of Contents