Figure 80
1. Fuse block
3.
Secure the switched power and ground branch
of the kit wire harness to the machine wire
harness with 5 cable ties.
16
Installing the CL-55 Modem
Parts needed for this procedure:
CL-55 modem—GeoLink precision spray system kit
1
(Model 41633 or Model 41634)
1
Modem bracket
Capscrew (#10-24 x 1-1/2 inches)
Spacer (1/4 x 3/4 inch)
2
Locknut (#10-24)
Preparing the Machine
Multi Pro 5800 Machines
1.
Remove the 2 flange locknuts (5/16 inch) and
2 flange-head bolts (5/16 x 1 inch) that secure
the air-cleaner mount to the right seat-box panel
(Figure
81).
g301672
2. Fuse (10 A)
1. Flange locknut (5/16
inch—coolant reservoir
bracket)
2. Capscrew (5/16 x 3/4
inch—rear position only,
coolant reservoir bracket)
2.
Remove the rear flange locknut (5/16 inch) and
capscrew (5/16 x 3/4 inch) that secures the
coolant reservoir bracket to the right seat-box
panel
(Figure
Connecting the Antenna Harness
to the Modem
1.
Plug the coaxial connector of the
modem-antenna harness labeled W
into the coaxial port of the CL-55 modem marked
W
/BT, and tighten the coaxial connector
IFI
(Figure
82).
30
Figure 81
3. Flange locknut (5/16
inch—air-cleaner mount)
4. Flange-head bolt (5/16 x 1
inch—air-cleaner mount)
81).
IFI
g310541