Toro GeoLink CL-55 Installation Instructions Manual page 7

Modem kit, multi pro 1750 or 5800 turf sprayer
Table of Contents

Advertisement

Assembling the Display Hood to
the Sprayer Monitor
1.
At the back of the sprayer monitor and with the
2 connectors (26 pin) aligned down, remove
the top locknut (5 mm) from the stud for the
ball-pivot fitting (A of
1. Locknut (5 mm)
2. Stud—5 mm (sprayer
monitor at the ball-pivot
fitting)
2.
Apply a coat of thread-locking compound
(wicking—medium-high strength) to the threads
Figure
8).
Figure 8
3. Display hood
4. Threaded standoff
for the nut part of the threaded standoff
9).
1. Thread-locking compound
(wicking—medium-high
strength)—nut threads of
the threaded standoff
3.
Thread the standoff into the stud for the ball-pivot
fitting (B of
250 N∙cm (22 in-lb).
4.
Apply a coat of thread-locking compound
(wicking—medium-high strength) to the threads
for the stud portion of the threaded standoff
(Figure
9).
5.
Remove the backing from the 2 adhesive strips
that you applied in
to the Sprayer Monitor (page
6.
Align the hole in the display hood with the stud
portion of the threaded standoff (B of
7.
Assemble the hood to the monitor (C of
8) with the locknut (5 mm) that you removed in
g198738
step 1.
Note:
Press down on the areas of the top of the
hood with the adhesive strips underneath.
8.
Torque the nut to 250 N∙cm (22 in-lb).
7
Figure 9
2. Thread-locking compound
(wicking—medium-high
strength)—stud threads
Figure
8) and torque the standoff to
Applying the Adhesive Strips
6).
(Figure
g031280
Figure
8).
Figure

Advertisement

Table of Contents
loading

This manual is also suitable for:

4163841639

Table of Contents