Toro GeoLink CL-55 Installation Instructions Manual page 44

Modem kit, multi pro 1750 or 5800 turf sprayer
Table of Contents

Advertisement

25
Performing a Flow Meter
Calibration
No Parts Required
Procedure
Calibrate the flow meter; refer to the Operator's
Manual or Software Guide for your GeoLink system.
26
Verifying the Cellular Status
No Parts Required
Procedure
1.
Press the S
YSTEM
swipe the F
S
ULL
corner of the system information window
118).
Figure 118
1. S
I
YSTEM
NFORMATION
2. F
S
icon
ULL
CREEN
2.
In the system information screen, use the scroll
bar to navigate to the CL55 icon
I
icon, and then
NFORMATION
icon in the upper right
CREEN
3. Scroll bar
(Figure
1. CL55 icon
3.
Press the CL55 icon to display the signal
strength
the modem signal strength is between -60 dBm
and -99 dBm.
Note:
less than -100 dBm, contact your authorized
Toro distributor, Toro NSN at 1-844-GEOLINK
(1-844-436-5465), or NSNTech@toro.com for
customer service.
4.
Swipe the F
system information screen.
(Figure
27
Performing a Compass
Calibration
At the Distributor's Location
g305245
No Parts Required
Procedure
Perform a compass calibration at the distributor's
location; refer to Calibrating the Compass in the
119).
Operator's Manual or Software Guide for your
GeoLink system.
44
Figure 119
2. Signal strength information
information.(Figure
119), and verify that
If the modem signal is equal to or
S
icon to minimize the
ULL
CREEN
g305244

Advertisement

Table of Contents
loading

This manual is also suitable for:

4163841639

Table of Contents