Procedure
CL-55 modem—GeoLink precision
spray system kit (Model 41633 or Model
41634)
16
Modem bracket
Capscrew (#10-24 x 1-1/2 inches)
Spacer (1/4 x 3/4 inch)
Locknut (#10-24)
17
No parts required
18
No parts required
19
No parts required
20
No parts required
21
No parts required
22
No parts required
23
No parts required
24
No parts required
25
No parts required
26
No parts required
27
No parts required
28
No parts required
29
No parts required
Description
3
Qty.
1
1
Install the CL-55 modem.
2
–
Connecting the battery.
–
Secure the data harness.
–
Install the right, front fender.
Install the engine-access panel and the
–
seat.
Complete the installation of the CL-55
–
modem kit.
–
Power the GeoLink components.
–
Configure the GPS corrections source.
–
Create a generic spray job.
–
Perform a flow meter calibration.
–
Verify the cellular status.
–
Perform a compass calibration.
–
Easing the nonvolatile RAM.
–
Perform a compass calibration.
Use