OPERATION
DUAL TILTDOZER
This lever is used to perform the blade lift, tilt, and pitch operations.
Lifting control
(a) RAISE
(b) HOLD: Blade is stopped and held in this position.
(c) LOWER
(d) FLOAT: Blade will move freely according to external force.
REMARK
When released from FLOAT position, this lever (7) will not return to
HOLD position, so it must be returned to HOLD by hand.
Single tilt operation
Operate the tilt switch (1) to the (C) position.
(A) RIGHT TILT
(B) LEFT TILT
EXPLANATION OF COMPONENTS
(1)
Tilt switch
(2)
Pitch button
3 - 45