Komatsu D475A-5E0 Operation & Maintenance Manual page 176

Bulldozer
Hide thumbs Also See for D475A-5E0:
Table of Contents

Advertisement

OPERATION
OPERATION
1. Turn fuel control dial (1) to the center position between Low idle
(MIN) and High idle (MAX) positions and run the engine at a
mid-range speed for 5 minutes under no load.
2. After warm-up is completed, check gauges and caution lamps
for proper operation. If any problem is found, repair it.
Continue to run the engine under a light load until engine
coolant temperature gauge indicator (2) is within the green
range (B).
(A): White range
(B): Green range
(C): Red range
3. Check for abnormal exhaust gas color, noise, or vibration. If any problem is found, contact your Komatsu
distributor.
OPERATION
OPERATION
3 - 123

Advertisement

Table of Contents
loading

Table of Contents