ATTACHMENTS, OPTIONS
EFFECTIVE METHOD OF OPERATION FOR DUAL TILTDOZER
SIDE-CUTTING OPERATIONS
Perform this operation in R pitch, and set the end face of the end
bit in contact with the rock face to perform cutting.
REMARK
With the dual tilt it is possible to increase the amount of tilt and to
perform side-cutting operations on higher walls.
HORIZONTAL DOZING OPERATIONS FROM SIDE SLOPE (ROUGH GROUND)
The dual tilt can give a larger amount of tilt, so when dozing from
a side slope, this is effective because the chassis becomes
horizontal after a short digging distance.
6 - 18