Komatsu D475A-5E0 Operation & Maintenance Manual page 395

Bulldozer
Hide thumbs Also See for D475A-5E0:
Table of Contents

Advertisement

MINING SPECIFICATION MACHINE
REPLACE POWER TRAIN CASE BREATHER ELEMENT
1. Remove clip (2) from breather assembly (1) at the left fender,
then remove cover (3).
2. Replace breather element (4) with a new part.
3. Install cover (3) and clip (2).
6 - 56
ATTACHMENTS, OPTIONS

Advertisement

Table of Contents
loading

Table of Contents