1. Replacing cab seals
1) Raise the cab to replace the seal at the mating surface of
the operator's cab assembly.
Weight of cab: Approximately 470 kg (1,036 lb)
(MSHA glass specification machine: Approximately
530 kg (1,169 lb))
2) Remove all the old seal with a scraper.
3) Remove any dirt or oil from the mounting surface of seal
(A).
4) Remove the paper backing from the new seal, then stick it
in the same position as the old seal.
The new seal is longer the necessary, so cut off the excess
portion.
2. Replacing dashboard seal
1) Remove the old seal and replace it with a new seal.
2) Coat the outside of the seal with grease (G2-Li).
(This is to make sliding easier and prevent deformation of
the seal when the cab is installed.)
3. Reinstalling cab
Install the cab parts in the opposite order to removal.
Connect all parts that were disconnected.
1) Lower the cab slowly on top of the floor frame.
2) Align the cab with the floor frame, then install bolts and
washers in holes (A) to (U).
Do not completly tighten the bolts. Screw them in 3 or 4
turns.
3) Tighten the bolts in holes (N) to (U) fully.
Tighten in the order (N), (U), (Q), (R), (O), (T), (P), (S).
4) Tighten bolts (A) to (M) completely.
5) connect the cab wiring harness connector and washer
hoses in reverse order of removal.
6) Install covers inside the cab in reverse order of removal.