EFFECTIVE METHOD OF OPERATION FOR DUAL TILTDOZER
S PITCH (STANDARD)
Normal operations
Applicable operation
Normal operations
F PITCH (PITCH DUMP)
Keep the pitch button pushed in and operate the right tilt.
Applicable operation
Digging natural ground and bed-rock (digging hard soil)
Pushing soil over cliffs
Pushing-up soil
(Reduces spillage of soil over the top surface of the blade, and
reduces amount of soil carried back)
6 - 14
ATTACHMENTS, OPTIONS