Ventilation And Extraction (Technical Ventilation); Ventilation For Heat Removal In Normal Operation; Technical Ventilation During Chamber Operation And When Emptying The Condensate Catchpot Of The Pump - Binder VDL Series Operating Manual

Vacuum drying oven with microprocessor program controller mb2
Hide thumbs Also See for VDL Series:
Table of Contents

Advertisement

Electrical connection
To completely separate the chamber from the power supply, you must disconnect the power plug. Install
the chamber in a way that the power plug is easily accessible and can be easily pulled in case of danger.
It is also possible to use a customer's explosion-protected emergency stop switch or a comparable power
disconnector.
The chamber plug (power plug) is unprotected because it must be disconnected in case of an emergency
to completely separate the chamber from the power supply. therefore the electrical connection must be
established outside a zone.
Explosion hazard due to sparking when disconnecting an improper electrical con-
nection.
Serious injury or death from burns and / or explosion pressure.
 Make sure that the electrical connection is located outside a zone t.
 Connect the plug outside the installation area of the VDL and the pump. Take into ac-
count the information on zone classification (chap. 3.5.2)
For the user there is no risk of temporary overvoltages in the sense of EN 61010-1:2010.
5.2

Ventilation and extraction (technical ventilation)

5.2.1

Ventilation for heat removal in normal operation

Install the vacuum drying oven in a well-ventilated place.
Danger of overheating due to lack of ventilation.
Damage to the chamber.
 Do NOT set up chambers in non-ventilated recesses.
 Ensure sufficient ventilation for dispersal of the heat.
 Observe the prescribed minimum distances when installing the chamber (chap. 5.1)
5.2.2
Technical ventilation during chamber operation and when emptying the conden-
sate catchpot of the pump
Provide active extraction at the location of installation. The extraction shall be provided as technical venti-
lation according to country-specific regulations (TRBS 2152 Part 2 for Germany). It must include the en-
tire installation area of the chamber.
In normal operation, it affects in particular the loading area of the chamber for the spatial limitation and
reduction of any possible explosive atmosphere when loading the chamber. Also in the event of a fault
(e.g. if the material to be loaded or the filled condensate catchpot of the pump falls down), it causes spa-
tial limitation and reduction of any possible explosive atmosphere.
Suction must be active during the entire operation of the chamber and when handling the condensate
catchpot of the pump. Extraction must lead into an explosion-proof area.
VDL (E3.1) 06/2020
DANGER
NOTICE