System Tests and Adjustments
The N5290/1A Millimeter Test System Preliminary Check
N5290/1A Incoming Electrical Inspection
In this section the manual receiver display test is ran to check the general
system integrity.
IMPORTANT! For N5224/5B, N5244/5B, and N5267B PNAs When
connecting the 5292-20014 semirigid cable it is critical that the 2.4 mm
end is connected to the PNA's REFn SOURCE OUT port and the SMA end is
connected to the N5292A test set's LO Band connector. Refer to
on page
Figure 3-2
PNA RF Port Connector to N5292A Test Set Lo Band Connector (2.4 mm)
If the N5290/1A system is already installed and no changes have occurred
to any of the instruments or cables, refer to
page 3-11
If a cable has been changed or disconnected reconnected or similar
change, refer to
EXCEPTION: If you swapped in a new head or swapped heads on the ports,
refer to
page
This section contains the following:
—
—
3-8
3-8.
/ Head Cable Checks.
"Running the Installation Calibration" on page
"The N5290/1A Millimeter Test System Preliminary Check" on
3-7.
"Initializing the N5290/1A Broadband System" on page 3-9
"Running the Installation Calibration" on page 3-9
"The Head Cable Checks" on
Keysight N5290/1A Service Guide
Figure 3-2
3-9.