System Tests and Adjustments
Information in This Chapter
Chapter Three at-a-Glance
Section Title
Before You Begin
ANSI/NCSL Z540.3–2006 and
ISO/IEC 17025 Verification
Non-Standards Compliant
Verification
"The N5290/1A Millimeter Test
System Preliminary Check" on
page 7
Test Management Environment
(TME) Performance Tests (N5290/1 A
Millimeter System Only)
b
Adjustments
a. These performance tests are included in the analyzer's firmware for Options S93898A.
b. These adjustments are included in the analyzer's firmware on all models and options.
3-2
Summary of Content
Items to consider or procedures to perform before testing is begun:
—
Verify the Operating Environment
—
Protect Against Electrostatic Discharge (ESD)
—
Review the Principles of Connector Care
The ANSI/NCSL Z540.3-2006 and ISO/IEC 17025 process of verifying
your analyzer/test set.
The Non-Standards Compliant process of verifying your analyzer/test
set.
Performing the operator's check N5290/1A and N5292A test set.
Inspecting and checking your test cables.
Perform these checks before performing system
verification.
A brief summary of the TME N5290/1A millimeter-wave test system
performance test process.
a
Setups and procedures for adjusting your analyzer:
—
LO Adjustment for mm Mode
—
IF Gain Adj for mm Mode
—
Source and Receiver Adj.
—
Receiver Characterization
—
IF Response Adj. for mm Mode
Keysight N5290/1A Service Guide