System Tests and Adjustments
ANSI/NCSL Z540.3–2006 and ISO/IEC 17025 Verification
ANSI/NCSL Z540.3–2006 and ISO/IEC 17025 Verification
To learn about the criteria for ANSI/NCSL Z540.3–2006 and ISO/IEC 17025
verification, refer to the service guide for your analyzer. Refer to
https://www.keysight.com/find/pna
http://na.support.keysight.com/mmwave/.
Non-Standards Compliant Verification
To meet the criteria for non-standards compliant verification, for your
instrument, refer to
refer to http://na.support.keysight.com/mmwave/.
The N5290/1A Millimeter Test System Preliminary Check
IMPORTANT! Before you begin any testing on a System or instrument,
always inspect the connectors on the instrument, the calibration kit,
cables and adapters.
To achieve the maximum system stability, allow the test set controller to
warm up for at least 90 minutes before performing the Operator's Check.
If you are testing an N5290/1A System, continue with following the
procedures in this section. If the N5292A test set has been identified as the
problem, then skip this section and refer to
Verification Procedure" on page
This chapter contains service information for a standalone N5292A-200 2-port
and N5292A-400 4-port controller Test Sets and for the N5290/1A Millimeter
Test System.
These initial Inspection and Operator's Checks are found here:
—
—
—
Keysight N5290/1A Service Guide
https://www.keysight.com/find/pna
"N5290/1A Incoming Electrical Inspection" on page 3-8
"N5292A Functional Verification Procedure" on page 3-16
"N5290/1A Millimeter-wave Test System Operator's Check" on page 3-41
or for your system, refer to
"N5292A Functional
3-16.
or for your system,
3-7