Maintenance; Physical Maintenance; Electrical Maintenance; Error Terms - Keysight Technologies N5290/1A PNA Series Service Manual

2-port and 4-port microwave network analyzer system (900 hz - 110 ghz / 900 hz - 120 ghz)
Table of Contents

Advertisement

General Purpose Maintenance Procedures

Maintenance

Maintenance
To prevent electrical shock, disconnect the analyzer from the mains
source before cleaning. Use a dry cloth or one slightly dampened
with water to clean the external case parts. Do not attempt to clean
internally.
To prevent electrical shock, disconnect the Keysight Technologies
Model N5292A, from mains before cleaning. Use a dry cloth or one
slightly dampened with water to clean the external case parts. Do
not attempt to clean internally.
This is a Safety Class 1 Product (provided with a protective earth
ground incorporated in the power cord). The mains plug shall only
be inserted in a socket outlet provided with a protective earth
contact. Any interruption of the protective conductor inside or
outside of the product is likely to make the product dangerous.
Intentional interruption is prohibited.

Physical Maintenance

Clean the cabinet, including the front panel, using a dry or slightly damp cloth
only.

Electrical Maintenance

Refer to
Refer to

Error Terms

For network analyzer error terms, refer to the Service Guide for your PNA.
Refer to www.keysight.com.
Keysight N5290/1A Service Guide
"Review the Principles of Connector Care" on page
"Keysight Support, Services, and Assistance" on page
3-5.
2-6.
8-3

Advertisement

Table of Contents
loading

This manual is also suitable for:

N5222bN5227bN5242bN5247bN5292aN5293a ... Show all

Table of Contents