Keysight Technologies N5290/1A PNA Series Service Manual page 45

2-port and 4-port microwave network analyzer system (900 hz - 110 ghz / 900 hz - 120 ghz)
Table of Contents

Advertisement

System Tests and Adjustments
The N5290/1A Millimeter Test System Preliminary Check
"If the Head Check Fails" on page 3-15
Initializing the N5290/1A Broadband System
If the N5290/1A system is already installed and no changes have occurred
to any of the instruments or cables, refer to
page
3-11.
If a cable has been changed or disconnected reconnected or similar
change, refer to
EXCEPTION: If you swapped in a new head or swapped heads on the ports
refer to refer to
page
3-9.
1. If required, assemble the system. Refer to Install the System, refer to
https://literature.cdn.keysight.com/litweb/pdf/N5292-90002.pdf.
2. Clean the test ports, shorts, and adapters. Torque to specification.
3. On the PNA press Setup > External Hardware > Millimeter Config
4. Press Instrument > Setup > External Hardware > Millimeter Head Off to
Millimeter Head On
5. Power down the PNA.
6. On the N5292A test set controller: verify the test set is powered down.
7. Power up the PNA.
8. Power up the N5292A.
The N5290/1A system should now initialize and recognize the mmW modules.
The port 1 module LED should be blue (addressed by the PNA and active) and
the other test port(s) should be green (no bias and on standby). See also,
the Head Check Fails" on page
Running the Installation Calibration
If the N5290/1A system is already installed and no changes have occurred
to any of the instruments or cables, refer to
page
3-11.
This installation calibration should be ran when you first install your system
and whenever you make any changes to your system's configuration. See also,
"If the Head Check Fails" on page
1. On the PNA, verify your N5290/1A system is in the correct configuration:
press Setup > External Hardware > Millimeter Config
Keysight N5290/1A Service Guide
"Running the Installation Calibration" on page
"Initializing the N5290/1A Broadband System" on
3-15.
3-15.
"The Head Cable Checks" on
3-9.
"The Head Cable Checks" on
"If
3-9

Advertisement

Table of Contents
loading

This manual is also suitable for:

N5222bN5227bN5242bN5247bN5292aN5293a ... Show all

Table of Contents