Toshiba Satellite 1400 Series Maintenance Manual page 304

Personal computer
Hide thumbs Also See for Satellite 1400 Series:
Table of Contents

Advertisement

4 Replacement Procedures
6. Disassembly of FPC cable used for Control PCB connecting. Pressure or stress
should not be given on FPC cable.
7. Disassembly of Control PCB. At first, move the Control PCB to the left.
8. Disassembly of Top case Pressure or stress should not be given on Top Case and Gate
TCP.
9. Disassembly of Screw and Cover Ass'y. Pressure or stress should not be given on
Source TCP. Maximum value of torque with Screw should be below 2.0kgf.cm
Figure 4-69 Disassembly of control PCB, Top case and Cover Ass'y
4-96
4.28 TFT FL (Model 14.1 LG.Philips)
Satellite 1400/2400 Series Maintenance Manual (960-364/365)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Satellite 2400 series

Table of Contents