Yamaha R1 Series 2015 Service Manual page 137

Table of Contents

Advertisement

1. Steering damper solenoid lead
2. Intake solenoid lead (sub-wire harness)
3. Front turn signal light lead (right)
4. Meter assembly
5. Intake air temperature sensor lead
6. Intake solenoid vacuum hose
7. Auxiliary light lead
8. Front turn signal light lead (left)
9. Clamp
10.Headlight assembly
11.Fuse box 1
12.Fuse box 2
A. Place the steering damper solenoid lead and
intake solenoid lead in the gap between the
front cowling and front cowling assembly stay.
B. Make sure that the front right turn signal light
lead is not placed in the gap between the
front cowling and front cowling assembly stay.
C. To front right turn signal light
D. Install the clamp on the steering damper
solenoid lead to the end of the R section of
the slit used for connecting the lead in the
headlight assembly.
E. Install the meter assembly coupler and cou-
pler cover securely to the meter assembly.
Make sure that the edges of the coupler
cover are not rolled up.
F. To front left turn signal light
G. Fasten the intake solenoid vacuum hose,
front left turn signal light lead, and auxiliary
light lead at the outside of the fuse box 1 with
the clamp.
H. Face the clamp on the steering damper sole-
noid lead downward, and then insert the
clamp until it contacts the rib of the headlight
assembly.
I. Install the rubber clamp to the fuse box 1, and
then insert until it contacts the projection on
the bracket.
J. Route the front left turn signal light lead to the
front of the fuse box 1.
K. Connect the front right turn signal light cou-
pler, and then fasten the front left turn signal
light leads with the clamp. The leads may be
positioned in any order within the clamp.
L. To intake solenoid
M. Insert the fuse box 2 into the rib of the head-
light cover.
2-62
CABLE ROUTING

Advertisement

Table of Contents
loading

Table of Contents