Yamaha R1 Series 2015 Service Manual page 133

Table of Contents

Advertisement

1. Intake funnel servo motor lead
2. Right handlebar switch lead (non-waterproof
2-pole)
3. Left handlebar switch lead (non-waterproof 4-
pole)
4. Right handlebar switch lead (non-waterproof
6-pole)
5. Right handlebar switch lead (waterproof 4-
pole)
6. Main switch lead (1-pole)
7. Main switch lead (2-pole)
8. Radiator fan motor relay lead
9. Left handlebar switch lead (waterproof 10-
pole)
10.Headlight control unit
11.Headlight control unit lead
12.Turn signal light lead (left)
13.Radiator fan motor lead (right) (black)
14.Radiator fan motor lead (left) (white)
15.Rectifier/regulator lead
16.Electrical components tray
17.Plastic locking tie
18.Secondary injector #4
19.Secondary injector #3
20.Secondary injector #2
21.Secondary injector #1
22.Secondary injector lead
23.Right handlebar switch lead
24.Left handlebar switch lead
25.Main switch lead
26.Fuel rail
A. Connect the intake funnel servo motor lead
on top of the frame, and then place it
between the air filter case and frame.
B. Route the leads (main harness side) from
front of the rib "D" on the electrical compo-
nents tray to the inside.
Connect the leads to the wire harness, and
then fasten the coupler to the electrical com-
ponents tray.
C. Route the radiator fan motor relay lead and
main switch lead (2-pole) to the rear of the rib
"D" on the electrical components tray.
Route the main switch lead (1-pole) from
front of the rib "D" on the electrical compo-
nents tray to the inside.
D. Rib on the electrical components tray
E. Connect the headlight control unit lead at the
top to the headlight control unit.
F. To intake solenoid
G. To front left turn signal light
H. The radiator fan motor couplers may be
installed to the electrical components tray in
any order.
Route the radiator fan motor lead to the rear
of the main switch lead and left handlebar
switch lead as shown in the illustration.
I. When installing the plastic locking tie to the
electrical components tray, position it in the
center within the range shown in the illustra-
tion.
J. Fit the secondary injector lead at the white
tape between the ribs of the air filter case.
K. Route the secondary injector lead between
the air filter case and cross bar.
L. Fasten the leads along the electrical compo-
nents tray with the plastic locking tie so that
they do not overlap one another.
Face the buckle of the plastic locking tie
upward. Do not cut off the excess end of the
plastic locking tie.
M. The left handlebar switch lead and main
switch lead may be routed in any order.
N. Fasten the right handlebar switch lead and
electrical components tray with the plastic
locking tie. Face the buckle of the plastic lock-
ing tie rearward, and then cut off the excess
end of the tie to 5 mm (0.2 in) or less.
O. Fasten the injector lead and fuel rail with the
plastic locking tie. Point the end of the plastic
locking tie rearward. Do not cut off the excess
end of the plastic locking tie.
2-58
CABLE ROUTING

Advertisement

Table of Contents
loading

Table of Contents