Mercury 150 EFI Service Manual page 599

Electronic fuel injection,
Table of Contents

Advertisement

ATTACHMENTS / CONTROL LINKAGE
Thread cap (e) onto steering cable mounting tube, up to mark (a).
STEERING CABLE INSTALLATION - PORT OUTBOARD
IMPORTANT: Lubricate inside of port outboard's tilt tube and rubber O-ring seal lo-
cated inside tilt tube with 2-4-C with Teflon, before installing steering cable.
Lubricate inside of port outboard's tilt tube and rubber O-ring seal (a) with 2-4-C with Te-
flon.
Insert steering cable end (b) (steering cable routed down starboard side of boat) thru tilt
tube (c) of port outboard and thread steering cable attaching nut (d) onto tilt tube hand
tight.
NOTE: Torque steering cable attaching nut only after final steering adjustments have
been made.
STEERING LINK ROD INSTALLATION
Steering link rods MUST BE secured between outboard steering arm and steering
cable end, using special washer head bolt (10-849838) and two nylon insert lock-
nuts (11-826709113), as shown. Both special washer head bolt and nylon insert
locknuts MUST BE tightened as specified.
Lubricate holes in ends of steering cables, with Quicksilver 2-4-C with Teflon. Assemble
steering link rods to steering cable ends of each outboard, using flat washers and nylon
insert locknuts. Tighten locknuts until they seat [DO NOT exceed 120 lb. in. (13.5 Nm) of
torque], then back nut off 1/4 turn.
Page 7-20
e
d
c
a
51888
a
51890
b
51887
WARNING
90-883728 JULY 2001

Advertisement

Table of Contents
loading

This manual is also suitable for:

175 efi200 efi150xri175xri200xri0t409000

Table of Contents