Installing Steering Cables - Mercury 150 EFI Service Manual

Electronic fuel injection,
Table of Contents

Advertisement

ATTACHMENTS / CONTROL LINKAGE

Installing Steering Cables

IMPORTANT: Lubricate inside of outboard tilt tube, inside of steering cable mount-
ing tube and rubber O-ring seal (located in outboard tilt tube) with Quicksilver 2-4-C
with Teflon before installing steering cables.
Lubricate inside of outboard tilt tube and inside of steering cable mounting tube with
Quicksilver 2-4-C with Teflon. Verify rubber O-ring seal (a) (located in outboard tilt tube)
is lubricated.
Insert steering cable ends (a) thru outboard tilt tube (b) and cable mounting tube (c).
Thread steering cable attaching nuts (d) on to tubes hand tight.
NOTE: Torque steering cable attaching nuts only after final steering adjustments have
been made.
Place a mark (a) on steering cable mounting tube (b) 5/8 in. (16 mm) from end of mounting
tube. Slide plastic spacer (c), O-ring (d) and cap (e) over steering cable.
Thread cap (e) onto steering cable mounting tube, up to mark (a).
Page 7-6
b
d
c
b
a
a
a
51890
a
51891
5/8 (16 mm)
51890
d
c
e
e
51890
90-883728 JULY 2001

Advertisement

Table of Contents
loading

This manual is also suitable for:

175 efi200 efi150xri175xri200xri0t409000

Table of Contents