Engine Operating; Engine Start - Rotax 125 MAX DD2 evo Installation Instructions And Operators Manual

Hide thumbs Also See for 125 MAX DD2 evo:
Table of Contents

Advertisement

ENGINE START

Before starting the engine, make sure you have completed all necessary tasks for running
the engine:
Fuel tank full.
✔ ✔
Battery charged and connected.
✔ ✔
Battery voltage over 12 V.
✔ ✔
Carburetor Bowden cable is moving freely and carburetor piston connected in idle
✔ ✔
position.
For safety reasons, it's recommended to put the shifting device in "Neutral" (no gear
✔ ✔
engaged).
At engine start proceed as follows:
Figure 4.1: Choke lever
4
Page 2
Edition: September 01 2019
Operators Manual

ENGINE OPERATING

Step
Procedure
1
On a cold engine, pull the choke lever (pos. 1, ) into a vertical position.
Procedure
Step
2
Press the power button once, the ignition system is activated (light turns
on). Press the button again until the engine starts. See Fig. "Power button"
NOTE
If the engine does not start, repeat the operation after a few seconds
in the same manner.
BRP-Rotax
Effectivity: 125 MAX DD2 evo

Advertisement

Table of Contents
loading

Table of Contents