Rotax 125 MAX DD2 evo Installation Instructions And Operators Manual page 15

Hide thumbs Also See for 125 MAX DD2 evo:
Table of Contents

Advertisement

INSTALLATION OF OVERLOAD
CLUTCH AND ENGINE WITH REAR
AXLE
NOTE
The overload clutch is the link between the en-
gine and the rear axle of the kart. In case that
the rear axle has been blocked by (e.g. break-
ing), the overload clutch is slipping slightly and
is not transferring the peak load from the rear
axle to the engine.
The plain bearings (pos. 2) are inside of the
overload clutch (pos. 1).
Figure 2.1
1
Overload clutch
Procedure
Step
1
Slide the clamp ring (pos. 1, following
figure ) the thrust washer (pos. 2) and
the overload clutch (3) to the middle of
the rear axle.
NOTE
The rear axle of the kart must have a smooth
surface (no grooves for keys) in the area of the
4 plain bearings of the overload clutch.
1
Page 2
Edition: September 01 2019
BRP-Rotax
INSTALLATION MANUAL
Plain bearings
2
NOTE
Do not tighten the overload clutch and clamp
ring yet (see section Engine attachment with en-
gine brackets).
Figure 2.2: Overload clutch
Clamping ring
1
3
Overload clutch
5
Allen screw M5x30
2
Thrust washer
4
Allen screw M6x25
Effectivity: 125 MAX DD2 evo

Advertisement

Table of Contents
loading

Table of Contents