Rotax 125 MAX DD2 evo Installation Instructions And Operators Manual page 98

Hide thumbs Also See for 125 MAX DD2 evo:
Table of Contents

Advertisement

Figure 3.13: Gear cover
Figure 3.14: Gear ratio
Effectivity: 125 MAX DD2 evo
BRP-Rotax
Operators Manual
Step
Procedure
4
Remove the primary drive gear (pos. 4) and secondary gear (pos. 5) and fit
the gear pair of your choice.
NOTE
At re-assembly, proceed in reverse sequence. Tighten the screws to
the following torque settings:
M6: 10 Nm (88 lbf. in.) / M8: 22 Nm (195 lbf. in.)
3
Page 17
Edition: September 01 2019

Advertisement

Table of Contents
loading

Table of Contents