Rotax 125 MAX DD2 evo Installation Instructions And Operators Manual page 51

Hide thumbs Also See for 125 MAX DD2 evo:
Table of Contents

Advertisement

Figure 7.8: Cable tie
1
Cable tie
3
Cable tie
Step
Procedure
8
Attach the 220 mm pressure line (pos.
1) to the magnetic valve (pos. 3). Se-
cure the pressure line on the magnetic
valve with a tie wrap (pos. 4). Attach
the other end of the pressure line to
the exhaust valve (pos. 2).
Figure 7.9
1
Pressure line
Magnetic valve
3
6
Page 6
Edition: September 01 2019
BRP-Rotax
INSTALLATION MANUAL
2
Black hose
2
Exhaust valve
4
Cable tie
Effectivity: 125 MAX DD2 evo

Advertisement

Table of Contents
loading

Table of Contents