Unpacking And Inspecting The Board; Requirements - SMART Embedded Computing MVME2502 Installation And Use Manual

Hide thumbs Also See for MVME2502:
Table of Contents

Advertisement

Hardware Preparation and Installation
2.2

Unpacking and Inspecting the Board

Read all notices and cautions prior to unpacking the product.
Damage of Circuits
Electrostatic discharge and incorrect installation and removal can damage circuits
or shorten its life.
Before touching the board or electronic components, make sure that you are
working in an ESD-safe environment.
Shipment Inspection
To inspect the shipment, perform the following steps:
1. Verify that you have received all items of your shipment:
MVME2502 board
Quick Start Guide
Safety Notes Summary
Any optional items ordered
2. Check for damage and report any damage or differences to customer service.
3. Remove the desiccant bag shipped together with the board and dispose of it according
to your country's legislation.
The product is thoroughly inspected before shipment. If any damage occurred during
transportation or any items are missing, contact customer service immediately.
2.3

Requirements

Make sure that the board meets the following requirements when operated in your
particular system configuration.
34
Hardware Preparation and Installation
NOTICE
MVME2502 Installation and Use (6806800R96G)

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MVME2502 and is the answer not in the manual?

Table of Contents