6-2 To Increase Glue Film Thickness
6-2-2 Melt Tank Height Adjustment
This section shows how to adjust melt tank
height to increase glue film thickness by
lowering a melt tank unit.
WARNING
Put gloves on your hands when you set
up melt tank unit height. Melt tank is
heated up to around 200 degrees. High
temperature can cause severe skin
burn.
Necessary Tools : Allen Wrench (5 mm)
Screw Driver
1.
Depress stop button.
2.
Open melt tank cover.
3.
Turn clockwise melt tank up/down screw
with Allen wrench until melt tank rises 1 to
2 mm.
4.
Loosen fix screw on spacer until spacer
can be moved.
5.
Turn spacer clockwise to insert it under
stopper. Confirm spacer is inserted under
stopper completely and then fasten fix
screw with screw driver.
6.
Loosen melt tank up/down screw with
Allen wrench.
7.
Close melt tank cover.
Melt Tank Up/down Screw
51
6. Special Binding Method
Melt Tank Cover
Fix Screw
Spacer
Stopper