Installing Output Monitoring Modules; Installing Sync Modules - Imagine communications Platinum PM-FR-5 Installation And Operation Manual

Frame and modules
Table of Contents

Advertisement

370
Chapter 7
Installation

Installing Output Monitoring Modules

1
2
3
4
5

Installing Sync Modules

1
2
3
4
5
6
To install or replace the optional output monitoring module, follow these steps.
On the rear of the Platinum frame, remove the two screws holding the option slot cover
plate. (A standard Phillips-head screwdriver is required.) Do not discard these screws, as you
will need them again.
Align the rear of the output monitoring module in the guide notches on either side of the
frame opening.
Noting the alignment of the module's mating connector inside the frame, slide the module
into the frame.
Re-install the two cover plate screws at either end of the output monitoring module rear
panel.
Configure the starting control level, destination, and source as described in your Navigator
or RouterMapper user manual.
To install or replace sync modules, follow these steps.
Open the I/O Guide door.
Locate the appropriate slot for the sync module, above the resource module (see
on page 9).
Align the sync module in the guide notches on either side of the frame opening.
From the front of the frame, slide the module into the slot; then, make sure it is fully seated
into the SYNC-MI module.
Ensure that the module's inserter/extractor lever is fully seated.
Close and lock the I/O Guide door.
Figure 1-7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Platinum pt-fr-28Platinum pt-fr-15Platinum pm-fr-9

Table of Contents