Chapter 7 Installation - Imagine communications Platinum PM-FR-5 Installation And Operation Manual

Frame and modules
Table of Contents

Advertisement

7
Installation
WARNING: Potentially lethal voltages are present within the Platinum frame
during normal operation. Disconnect all power cords from the frame before you
remove the top panel. Do not apply power to the frame while the top is open
unless the unit is being serviced by properly trained personnel.
This chapter provides information specific to the installation of the Platinum router. All
modules and power supplies ordered will be installed in the Platinum frame before it is
shipped. For field expansion and/or replacement installation information, see the following
topics covered in this chapter:
Field Upgrading and/or Replacing Platinum Components
Installing Alarm Modules
Installing a Platinum Frame
Installing Back Panel Modules
Replacing Fans
Installing Input and Output Modules
Installing Resource Modules
Replacing Resource Module Firmware
Installing Output Monitoring Modules
Installing Power Supplies
Installing Sync Modules
Specialized Installation and Removal Procedures for PT-HS1310S-IB,
PT-HSRO-OBG+, and PT-HSR1310S-OB Fiber Optical Modules
CAUTION: We recommend that you test your system before its final installation.
Make sure you verify its configuration, cabling, and proper system operation.
Observe proper anti-static and grounding procedures while handling loose boards
and servicing the equipment.
on page 371
on page 382
on page 372
on page 379
on page 361
on page 373
on page 377
on page 370
on page 384
on page 373
on page 370
on page 365
355